CeragonCeragon

CASE STUDY

Case study: APAC operator migrates & installs large NMS remotely

 

With capacity needs increasing substantially, a leading operator in APAC had to quickly adapt its network to meet this new demand.

One of the operator’s key challenges was migrating its large network management system (NMS) to a new platform. While such projects typically involve many onsite engineers, this was not possible due to lockdowns arising from the COVID-19 pandemic.

 

 

NMS _case_studyTABLET_RCimage538w-1